Skip to content

Professional portfolio

Professional portfolio

Export a signed, bilingual summary of your membership, credentials, certificates and CPD — with a verification QR. And control what others see in the directory.

Who is it for?

Language

Export & share

Live preview

5 sections · A4
NA

Noura Ahmed Al-Ahmad

نورة أحمد الأحمد

Senior Mining Engineer · Saudi Arabian Mining Company (Ma'aden)

Professional summary

نبذة مهنية

Mining engineer with nine years in open-pit planning and blast optimisation, leading the short-range planning team at Ad Duwayhi gold mine.

  • • MSc Mining Engineering — KFUPM (2019)
  • • BSc Mining Engineering — King Abdulaziz University (2014)

Professional credentials

الاعتمادات المهنية
Certified Mining PractitionerCMP-25-0418-QX71 Mar 2028
Mine Safety SupervisorMSS-24-1180-HB230 Nov 2026

Certificates

الشهادات
  • Blasting Engineering Fundamentals14 May 2026
  • Mining Practitioner membership 2026–202718 Sept 2026
  • Certified Mining Practitioner2 Mar 2025
  • Future Mining Forum 202523 Oct 2025

CPD transcript 2026

سجل التطوير المهني 2026
Blasting Engineering FundamentalsTraining course8h
Open-pit safety webinarWebinar3h
Mentoring graduate engineersMentoring4h
Future Minerals Forum — RiyadhConference4h
Guided reading: mineral resource reporting codesSelf-study3h

Approved total: 22 of 30 hours

Electronically issued and digitally signed by the Mining Association.

وثيقة صادرة إلكترونياً وموقّعة رقمياً من جمعية التعدين.

PF-2026-NA4812 · 7 Oct 2026

Scan to verify