Logo lockups
#logoHorizontal, vertical and emblem — on approved backgrounds
For review & approval before design
The visual and motion foundation for every screen: built on the Mining Association's official identity guide and evolved for web and mobile, Arabic and English, light and dark. Approve each component or request changes right on this page.
60+
components & patterns
2
languages RTL / LTR
AA
WCAG accessibility target
01
Horizontal, vertical and emblem — on approved backgrounds
02
★ = the guide's exact value. Click any swatch to copy.
Teal
Primary — trust & depth
Terracotta
Actions & calls to action
Gold
Highlight only — max 5%
Sand
Warm surfaces & backgrounds
Stone
Corporate greys for text
The strata bar doubles as a signature section divider
Status never relies on color alone — each has an icon and text
03
Our minerals, our future's energy
A professional community for mining
A membership for every stage
My recent requests
Professional details
Join a community of specialists, students and experts in mining and earth sciences, and grow your career.
At least 8 characters including letters and numbers.
04
Lines draw in on appear, then drift very slowly. Stops automatically with reduced-motion.
Together for a more prosperous future
Our wealth, made by its people
Gold mineral particles drifting and glinting. Used on dark surfaces: hero, admin banner, side nav, membership card, next-step panel and success moment. Move the pointer over them.

Over photography
On deep teal
Calm for workspaces
From the guide's “Filters” page — they harmonize any photo with the brand. Current photos are temporary from Wikimedia Commons.



05
Durations — press play
Direction-aware transition (RTL/LTR)
STEP 1/3
Personal details
Springs
06
Variants
Sizes & states
On dark surfaces
07
10 digits starting with 1 (citizen) or 2 (resident) — e.g. 1XXXXXXXXX
Complete the address, like name@domain.com
We'll send a verification code
At least 8 characters with letters and numbers
Reference data via autocomplete instead of free text, and a Gregorian picker showing Umm al-Qura Hijri under every day.
Search registered employers or add a new one
Checkbox & consent
Preference switches
Single choice — list
Single choice — cards
View toggle & filter chips
Paste anywhere, SMS autofill, a gentle shake on error, and a resend countdown.
Enter the code sent to +966 55 ••• 4567
After a submit attempt: a summary linking to each field, focus moves to the first error. The autosave indicator always reassures.
2 fields need your attention
Drag & drop, camera, or attach an already-verified document from “My documents” in one tap. Try uploading or press the buttons.
Drag & drop your file here, or
PDF, JPG, PNG · up to 10 MB
degree-certificate.pdf
320 KB · Uploaded
photo.jpg
Larger than 10 MB — try compressing the image
09
Sizes & dot style for dense tables
10
Requests by category
64
total
New requests — last 12 weeks
One filtered list feeds everything: clickable insight strip, saved views (save your own), quick & advanced filters with live counts, collapsible grouping, sticky header and pinned columns, drag-to-resize and reorderable columns, Shift multi-sort, expandable row previews, inline reassignment, a drag-and-drop kanban board, live arrivals and keyboard shortcuts (press ?).
Showing 1–8 of 26
What the member sees: understandable events with dates; the current one gently pulses.
Awaiting final approval
With the approval committee
Recommended for approval
Reviewer: Sara Al-Otaibi
You uploaded the requested document
A document correction was requested
Application received
Avatars & groups
3 online · 12 requests distributed
2
days to decide
4h
first support reply
4.7
event rating
11
The applicant is notified automatically
3 CPD hours approved
Your membership expires in 18 days
Payment couldn't be completed
Scheduled maintenance
For quick confirmations only, with undo where possible.
Skeleton ·
Empty
Register for a course or event and it will appear here with reminders.
Error
A temporary error on our side. Your data is safe.
Try other words or clear filters.
If you believe this is a mistake, contact your administrator.
12
Move the pointer over it for tilt and gold sheen; click to flip and reveal the signed QR (works offline).
Noura Ahmed Al-Ahmad
نورة أحمد الأحمد
Member no.
SMA-MP-004812
Since
2024/10
Valid until
2027/09/30
Verify membership
Scan to verify validity and status. The code works offline — it is digitally signed.
SMA-MP-004812
Last synced: today 9:41 AM
Card status
The five categories from the mockups, with a brand-filtered photo and compare option.

ST
Mining & earth-science students
Annual fee · Free

MP
For professionals in mining operations
Annual fee · SAR 750

PF
For leaders and senior experts
Annual fee · SAR 1,500
10
Oct 2026

Online
+6 CPD34 seats available
SAR 350 · free for members
02
Nov 2026

Riyadh, Saudi Arabia
+8 CPDOnly 6 seats left
SAR 1,200
15
Dec 2026

Dammam
+4 CPD18 seats available
SAR 450
Everything waiting on the member, prioritized; each task opens the exact screen.
Complete a document in your application
UrgentThe reviewer asked for a stamped experience letter
Due in 12 days
Pay for the event
Your seat at the forum is held for 24 hours
Hold ends 10:00 PM
You need 12 more CPD hours
140 days left — 3 courses match your gap
Rate the “Mine safety” workshop
Required to issue your attendance certificate
Quick links
Answers instantly: who owns it now? what do I do? when to expect a decision?
MEM-2026-004812
Action needed from you
The reviewer requested a stamped experience letter. Upload it and review resumes immediately.
Deadline: 12 days
CRD-PMP-2026-00091
With the Association — nothing needed from you
The credentials team is reviewing your file and references.
Expected decision: Oct 14 (3 working days)
National ID copy
Uploaded Mar 12 · 450 KB
BSc — Mining Engineering
Used in 2 requests
Professional license
No. 44-1290
Experience letter — Ma'aden
Awaiting staff check
Amount, VAT and total before redirecting to the gateway. Audit shows before/after values.
Sara Al-Otaibi edited application data
2026/09/26 · 11:20
Approved vs required, pending shown separately, and the split by activity type with caps.
0/30
approved hours
+3 pending
Every blocker has a direct action — press them to watch the list complete and enable renew.
Renewal readiness
2 items blocking renewal
Profile is up to date
Updated 2 months ago
CPD hours for this cycle
22 of 30 hours
Professional license is valid
Expires in 21 days
No outstanding balance
No pending invoices
A clear result with minimum data — no ID, no mobile. A revoked certificate shows “revoked”, never “not found”.
Valid & active membership
N. Ahmed Al-Ahmad
Checked at 2026/10/06 · 14:32
Branded template with a unique non-sequential number and verification QR — designed for A4 landscape print.
The Mining Association certifies that
Noura Ahmed Al-Ahmad
has fulfilled the requirements of the professional credential
Professional Mining Engineer
Certificate no.: CERT-2026-7KQ4M9XD
Issued: 2026/10/06
Valid until: 2029/10/05
Reserved for big moments: submission, activation, credential issued.
MEM-2026-004812
Our team will review it in about 3 working days and keep you posted.